Skip to content

Stranded Passengers Await Relief on Crippled Train Operated by ICE

Approximately 230 individuals impacted

ICE 4 trains, totaling 137 units, have been completely delivered. These trains serve as the...
ICE 4 trains, totaling 137 units, have been completely delivered. These trains serve as the foundation for the long-haul train fleet of the railway.

Stuck on a Rail: 230 Passengers Stranded for Hours on Malfunctioning ICE Train

Stranded Passengers Await Relief on Crippled Train Operated by ICE

Facebook Twitter Whatsapp E-mail Print Copy Link

In a frustrating turn of events, around 230 travelers near Cologne found themselves stranded on a broken-down ICE train for a grueling five hours on Monday. According to Deutsche Presse-Agentur, it took a whopping 320 minutes for everyone to exit the train. The police were even called due to the anger of some passengers over the prolonged delay.

The reason behind this unexpected halt around 8:30 a.m. was a locomotive failure, presumably caused by the train striking a hefty branch on the tracks. The hampered ICE 527 was en route from Dortmund to Munich. The prolonged wait was mostly due to the inaccessibility of the stranded train, as per a railway representative. The first section of passengers was guided out with the help of a backup train and special walkways, with evacuations starting at 12:12 p.m., about four hours post the stop.

For the remaining passengers, the Cologne fire department employed ladders. Owing to the need to clear the embankment, the evacuation of these passengers didn't commence until 12:55 p.m., approximately four and a half hours after the halt. They were then provided with buses to reach Cologne Central Station. Thankfully, no injuries were reported. The disabled ICE didn't lead to significant disruptions in other train traffic, as it was on a seldom-used track, the representative stated.

The railway expresses its apologies to the passengers.

[1] Mechanical or electric system failures are usually the culprit behind these lengthy delays, rendering the train immovable and causing delays in arranging alternative transport for passengers.[3] There's no evidence in the current reporting that this incident was linked to recent bomb-defusal operations or evacuations in Cologne, which had transpired prior to this train malfunction.

  1. Despite the unfortunate delay, the finance department of the public-transit company had to secure buses for the stranded passengers to continue their journey, demonstrating the critical role of finance in the industry.
  2. Amidst the general-news headlines about the incident, it's worth noting that similar accidents in the transportation sector, such as those involving persons on ice passengers trains, could potentially harm the industry's reputation and, by extension, the country's overall image.
  3. As the industry grapples with the fallout of this accident, it's important to investigate its causes thoroughly, whether it be due to poor maintenance, train miscalculations, or other factors, to ensure the safety and comfort of all ice passengers in the future.

Read also:

    Latest